Commission invites comments and suggestions in the matter of consent for draft 2nd amendment to PPA dated 17.09.2019 entered between TGGENCO and TGDiscoms for extending the validity of agreement period of RTS-B(62.5 MW) for the period from 01.04.2024 to 03.06.2024 and KTPS-V (500 MW) for the period from 01.04.2024 to 31.03.2029 Last date for receipt of objection/Comments: 18.10.2024 before 5:00PM. |
Public Notice Proposals & related documents |
||||||
Commission invites comments and suggestions on the filings made by TGGENCO for True-up for FY 2022-23 and MYT for control period FY 2024-25 to FY 2028-29 Last date for receipt of objection/suggestions: 11.10.2024 before 5:00PM Date of Public Hearing: 21.10.2024 from 10:30 AM onwards at TGERC court hall. |
Public Notice Filings |
||||||
Commission invites comments and suggestions on the filings made by CESS for their Retail Supply business for approval of ARR for 5th MYT(FY 2024-25 to FY 2028-29) & ERC for FY 2024-25 Last date for receipt of objection/suggestions: 14.10.2024 before 5:00PM Date of Public Hearing on CESS filings: 25.10.2024 from 10:30 AM onwards at Padmanayaka kalyanamandapam, Siddipet Road, Sircilla. |
Public Notice Filings |
||||||
Commission invites comments and suggestions on the filings made by TGTRANSCO for Transmission Business and State Load Dispatch Centre(SLDC) activity of TGTRANSCO for 5th MYT for the period (FY 2024-25 to FY 2028-29) Last date for receiving Comments/Suggestions: 11.10.2024 before 5.00PM. Date of Public Hearing: 22.10.2024 from 10:30 AM onwards in the court hall of TGERC. |
Public Notice Filings |
||||||
Commission invites comments and suggestions on the filings made by TGDISCOMs on a) Determination of ARR & Wheeling charges for 5th control period (from FY 2024-25 to FY 2028-29) for Distribution Business b) Determination of ARR for 5th MYT (FY 2024-25 to FY 2028-29) & FPT for FY 2024-25 and CSS for FY 2024-25 for their Retail Supply business Last date for receiving Comments/Suggestions: 11.10.2024 before 5.00PM. Date of Public Hearing on TGSPDCL filings: 23.10.2024 from 10:30 AM onwards in the court hall of TGERC. Date of Public Hearing on TGNPDCL filings: 24.10.2024 from 10:30 AM onwards at Integrated District Officer Complex(Collectorate office), Nizamabad |
Public Notice Distribution Business Filings & Additional Information of TGSPDCL & TGNPDCL Retail Supply Business Filings of TGSPDCL & TGNPDCL |
||||||
Commission invites comments and suggestions on the filings made by TGSPDCL and TGNPDCL in the matter of determination of Additional Surcharge to be levied on Open Access consumers for second half (H2) of FY 2024-25 Last date for receiving Comments/Suggestions is upto : 27.08.2024 before 5.00PM. Next date of Public Hearing : 27.09.2024 from 11:00 hrs onwards in the Court Hall of TGERC at Sy.No.145-P Vidyut Niyantran Bhavan, Kalyan Nagar, G.T.S Colony, Hyderabad. |
Public Notice Filings & Relevant data of TGSPDCL & TGNPDCL Objection Replies |
||||||
Commission invites comments and suggestions in the matter of Suo-Moto determination of Compliance Renewable Power Purchase Obligation for the obligated entities for FY 2022-23. Last date for receiving Comments/Suggestions: on or before 27.08.2024 before 5.00PM. Public Hearing is scheduled on 30.08.2024 from 11:00 hrs onwards in the Court Hall of TGERC. |
Public Notice TGERC Public Notice View Objections |
||||||
Commission invites comments and suggestions in the matter of Suo-Moto determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the state of Telangana, and having Power Purchase Agreements (PPAs) with the Distribution Licensees, for FY 2024-25 to FY 2028-29 Last date for receiving Comments/Suggestions: on or before 24.08.2024 before 5.00PM. |
Public Notice | ||||||
Commission invites Objections/Suggestions in the matter of fresh determination of Cross Subsidy Surcharge to be levied for the FYs 2005-06 to 2014-15 in respect of the open access consumers by TSDISCOMs under section 42 of the Electricity Act, 2003 pursuant to directions given by the Hon’ble High Court in its common Order dated 12.02.2020 in W.P.No.21936 of 2018 & others Last date for receiving objections / suggestions is extended upto 15.06.2024 before 5.00 PM Public Hearing is scheduled on 26.06.2024 from 11:00 AM onwards in the court hall of TGERC. |
Revised Public Notice 2 Revised Public Notice Public Notice and Relevant Documents Objections |
||||||
Commission invites Objections/Suggestions on the Multi Year Tariff (MYT) filings of Singareni Thermal Power Projects, (2X600 MW) for the period FY 2024-25 to FY 2028-29 and true up for FY 2022-23. Last date for receiving Objections/Suggestions is extended upto 14.03.2024 before 5.00PM Due to administrative reasons Public Hearing is rescheduled to 19.04.2024 from 11:00 hrs onwards in the Court Hall of TSERC. |
Revised Public Notice 2 Revised Public Notice Public Notice MYT Filings Objections Replies Additional Information |
||||||
Commission invites Objections/Suggestions in the matter of afresh determination of Cross Subsidy Surcharge for FY 2015-16 as per the directions of the Hon’ble Supreme Court in its order dated 07.11.2023 in Civil Appeal Nos.7517-7536, 7545-7552 and 7553-7560 of 2023 (SLP No.14047- 14066 of 2019).
Last date for receiving Objections/Suggestions is extended from 15.02.2024 to 22.02.2024 by 5:00 PM Public Hearing scheduled on 22.02.2024 is postponed to 28.02.2024 from 11:00 AM onwards in the court hall of TSERC. |
Revised Public Notice Public Notice Relevant Documents Objections Replies to the objections raised during Public Hearing |
||||||
Commission invites objections and suggestions on the filings made by TSTRANSCO in the matter of Annual Performance Review of Transmission Business and SLDC Activity for FY 2022-23. Last date for receiving Comments/Suggestions: 26.02.2024 before 5.00PM Date of Public Hearing : 14.03.2024 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice TSTRANSCO Filings SLDC Filings |
||||||
Commission invites comments and suggestions on Draft Telangana State Electricity Regulatory Commission (Multi Year Tariff) Regulation, 2023. Last date for receiving Comments/Suggestions: is extended to 14.12.2023 before 5.00 PM. Considering the significance of the Regulation and need for eliciting best of the views on the provisions made in draft regulation, the Commission has decided to conduct public hearing on 18.12.2023 at 11.00 am in the court hall of TSERC. |
Public Notice Draft Regulation Explanatory Note Objections |
||||||
Commission invites comments and suggestions in the matter of passing consequential order as per the Hon’ble Appellate Tribunal for Electricity (APTEL) order dated 08.03.2022 for determining the variable component of tariff for biomass and bagasse-based power plants for the period from 01.04.2014 to 31.03.2019.
Last date for receiving Comments/Suggestions: revised to 10.07.2023 before 5.00PM. Next date of Public Hearing is on 30.08.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice View Appeal No 250 of 2014 APERC order Dt: 19.07.2014 APERC order Dt:16.05.2014 Objections Replies Annexures |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge to be levied on Open Access consumers for second half (H2) of FY 2023-24
Last date for receiving Comments/Suggestions is upto : 02.08.2023 before 5.00PM Date of Public Hearing : 23.08.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice FILINGS Objections Replies |
||||||
Commission invites comments and suggestions on the filings made by TSGENCO in the matter of approval of Capital Investment plan and Business plan for the 5th Control Period (FY 2024-25 to FY 2028-29).
Last date for receiving Comments/Suggestions : 28.06.2023 before 5.00PM Public Hearing is rescheduled on 20.07.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Revised Public Notice Public Notice TSGENCO FILING Objections Replies |
||||||
Filings made by TSTRANSCO in the matter of approval of Resource plan 5th Control Period (FY 2024-25 to FY 2028-29) and 6th Control Period (FY 2029-30 to FY 2033-34) Next date of Public Hearing is 08.11.2023 from 11:00 hrs onwards in the court Hall of TSERC. |
Revised Public Notice Public Notice TSTRANSCO Filing Revised Filing Additional Information Objection Replies 1 & 2 |
||||||
Commission invites comments and suggestions on the filings made by Singareni Collieries Co. Ltd in the matter of Capital Investment Plan and Business Plan for FY 2024-25 to 2028-29 for 2x600 MW Singareni Thermal Power Plant. Last date for receiving Comments/Suggestions: 16.10.2023 before 5.00PM. Public Hearing is scheduled on 31.10.2023 from 11:00 hrs onwards in the court Hall of TSERC. |
Public Notice Filings O.P.No 25 of 2023 Filings O.P.No 26 of 2023 Additional Information 1 Additional Information 2 Objections Replies |
||||||
TSERC invites sealed quotations for Selection of agency/firm for customization and implementation of existing Petition e-Filing software in TSERC. Last date for submission of quotations: 18.10.2023. | View | ||||||
Employment Notification for the post of Commission Secretary (one post) | View | ||||||
Commission invites comments and suggestions in the matter of approval of certain amendments to model connection agreement proposed by SLDC and TSTRANSCO. Last date for receiving Comments/Suggestions: 01.11.2023 before 5.00PM. |
Public Notice Draft Amendments |
||||||
Commission invites comments and suggestions on the proposal submitted by TSSLDC for fixation of remuneration and charges payable to stage agency for discharge of its functions under RPPO Regulation No 7 of 2022. Last date for receiving Comments/Suggestions: on or before 11.10.2023 before 5.00PM. |
Public Notice View |
||||||
Public Hearing in the matter of a) filings made by TSSPDCL and TSNPDCL in the matter of approval of Resource plan (Sales Forecast, Load Forecast, Power Procurement plan and Capital Investment plan) for 5th Control Period (FY 2024-25 to FY 2028-29) and 6th Control Period (FY 2029-30 to FY 2033-34). b) filings made by TSSPDCL and TSNPDCL in the matter of approval of Business plan for 5th Control Period (FY 2024-25 to FY 2028-29) and 6th Control Period (FY 2029-30 to FY 2033-34). Further Hearing is rescheduled on 18.10.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice Business plan filings Objection Replies Resource plan filings Objections Replies Response to the Objections Received during public hearing held on 01.09.2023 Additional Information (TSSPDCL) Additional Information (TSNPDCL) Additional Information (TSNPDCL) 2 & 3 |
||||||
Commission invites comments and suggestions in the matter Suo-Moto determination of Renewable Power Purchase Obligation compliance for FY 2019-20 to 2021-22. Last date for receiving Comments/Suggestions: on or before 20.09.2023 before 5.00PM. Public Hearing is scheduled on 25.09.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice View Objections |
||||||
Commission invites comments and suggestions on the filings made by Singareni Collieries Co. Ltd in the matter of Capital Investment Plan and Business Plan for FY 2024-25 to 2028-29 for 2x600 MW Singareni Thermal Power Plant. Last date for receiving Comments/Suggestions: 16.10.2023 before 5.00PM. Public Hearing is scheduled on 31.10.2023 from 11:00 hrs onwards in the court Hall of TSERC. |
Public Notice Filings O.P.No 25 of 2023 Filings O.P.No 26 of 2023 |
||||||
Commission invites comments and suggestions on the proposal submitted by TSSLDC for fixation of remuneration and charges payable to stage agency for discharge of its functions under RPPO Regulation No 7 of 2022. Last date for receiving Comments/Suggestions: on or before 11.10.2023 before 5.00PM. |
Public Notice View |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge to be levied on Open Access consumers for second half (H2) of FY 2023-24
Last date for receiving Comments/Suggestions is upto : 02.08.2023 before 5.00PM Date of Public Hearing : 23.08.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice FILINGS Objections Replies |
||||||
Commission invites comments and suggestions on the filings made by TSGENCO in the matter of approval of Capital Investment plan and Business plan for the 5th Control Period (FY 2024-25 to FY 2028-29).
Last date for receiving Comments/Suggestions : 28.06.2023 before 5.00PM Public Hearing is rescheduled on 20.07.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Revised Public Notice Public Notice TSGENCO FILING Objections Replies |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge for H1 of FY 2023-24.
Date of Public Hearing : 13.03.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice Petition : TSSPDCL in OP No.75 of 2022 TSNPDCL in OP No.76 of 2022 Objections Replies |
||||||
Discussion Paper for inviting comments/objections from stakeholders/general public for finalization Telangana State Electricity Regulatory Commission (Terms and conditions of Open Access), Regulation, 2023. Last date for receiving Comments and Suggestion : 23.02.2023 before 5PM. |
View | ||||||
Commission invites comments and suggestions in the matter of amendment of the PPAs to shift the billing cycle for Renewable Energy projects under PPA to calendar month from 24th /25th of month in accordance to the Regulation No.1 of 2023 for the purpose of computation of Fuel Surcharge Adjustment/Fuel Cost Adjustment. Last date for receiving Comments/Suggestions: 21.06.2023 before 5:00 PM |
Public Notice TSSPDCL Proposal TSNPDCL Proposal |
||||||
Commission invites Comments/Suggestions/Objections in the matter of Proposals of TSSPDCL for consent of Draft amendment to the Power Purchase Agreement entered with M/s.Ganpati Sugar Industries Limited for extension of PPA for further period of 5 years with effect from 01.01.2023 to 31.12.2027. Last date for receiving Comments/Suggestions: 15.07.2023 before 5.00PM. |
Public Notice Draft PPA PPA of Ganpathi APERC Consent |
||||||
Commission invites comments and suggestions in the matter of passing consequential order as per the Hon’ble Appellate Tribunal for Electricity (APTEL) order dated 08.03.2022 for determining the variable component of tariff for biomass and bagasse-based power plants for the period from 01.04.2014 to 31.03.2019. Last date for receiving Comments/Suggestions: 21.06.2023 before 5.00PM. Date of Public Hearing : 28.06.2023 from 11:30 hrs onwards in the Court Hall of TSERC. |
Public Notice View |
||||||
Commission invites comments and suggestions in the matter of amendment of the PPAs to shift the billing cycle for Renewable Energy projects under PPA to calendar month from 24th /25th of month in accordance to the Regulation No.1 of 2023 for the purpose of computation of Fuel Surcharge Adjustment/Fuel Cost Adjustment. Last date for receiving Comments/Suggestions: 21.06.2023 before 5:00 PM.. |
Public Notice TSSPDCL Proposal TSNPDCL Proposal |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge for H1 of FY 2023-24.
Last date for receiving Comments/Suggestions: 12.01.2023 before 5.00PM Date of Public Hearing : 28.01.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice TSNPDCL in OP No.76 of 2022 |
||||||
Commission invites comments and suggestions on the filings made by Singareni Collieries Co. Ltd. (SCCL) in the matter of Mid-term Review and for truing-up of generation tariff for STPP of 2x600 MW for FYs 2019-22 and for approval of revised tariff for FYs 2022-24.
Last date for receiving Comments/Suggestions: 12.01.2023 before 5.00PM Date of Public Hearing : 30.01.2023 from 11:00 hrs onwards in the Court Hall of TSERC. |
Public Notice SCCL petition in O.P.No. 77 of 2022 Additional Information |
||||||
Commission invites Comments/ Suggestions/ Objections in the matter of True-up of Distribution Business for the period from FY 2006-07 to 2020-21. Due to Administrative reasons, the public hearing scheduled on 15.11.2022 at 10:30 AM was postponed. Revised date of Public Hearing is 18.01.2023 at 10:30 AM in the Court hall of TSERC.. |
Revised Notice 3 Revised Notice 2 Revised Notice 1 Notice TSSPDCL Filings TSNPDCL Filings TSSPDCL Additional Information TSNPDCL Additional Information |
||||||
Commission invites Comments/ Suggestions/ Objections in the matter of Procurement of 1045 MW Solar power from NTPC under CPSU Scheme Phase-II Tranche-III, 500 MW Solar power from NHPC under CPSU Scheme phase-II Tranche-III and 1000MW Solar power from SECI under ISTS Tranche-IX by TSDISCOMS. Last date for receiving Comments/Suggestions: 26.08.2022 before 5.00PM. Public Hearing is scheduled on 13.09.2022 at TSERC Court Hall from 11:30 AM onwards. |
Notice TSDISCOM Proposals CPSU NTPC PSA SECI |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge that is to be levied on open access (OA) users for the 2nd half (H2) of FY 2022-23. Last date for receiving Comments/Suggestions: 09.08.2022 before 5.00PM. Public Hearing is scheduled on 24.08.2022 at TSERC Court Hall from 11:00 AM onwards. |
Notice TSSPDCL TSNPDCL |
||||||
Commission invites comments and suggestions in the matter of draft PPA with M/s.Srinivasa Power Private Limited. Last date for receiving Comments/Suggestions: 18.06.2022 before 5.00PM. |
Notice PPA TSSPDCL justification and affidavit Draft PPA APERC Order |
||||||
Commission invites Comments/ Suggestions/ Objections in the matter of consent of Power Usage Agreement entered between M/s.NTPC Limited and TSDISCOMs for procurement of 1692 MW Solar power from NTPC ISTS connected solar power projects under CPSU Scheme with Tariff of Rs. 2.86/kWh for 1296 MW, Rs.2.74/kWh for 90MW and Rs.2.69/kWh for 306MW. Last date for receiving comments/suggestions/Objections is 21.04.2022 before 5.00PM. |
Notice View
Public Notice Revised Public Notice Objection Replies |
||||||
Commission invites comments and suggestions in the matter of draft PPA with M/s. Madhucon Sugar and Power Industries Limited. Last date for receiving Comments/Suggestions: 03.02.2022 before 5.00PM. |
Notice TSNPDCL proposal along with Draft PPA TSNPDCL letter on Justification for procurement of 19MW RE power |
||||||
Commission invites comments and suggestions in the matter of draft model Connection Agreement as per provisions of State Electricity Grid Code Regulation NO 4 of 2018. Last date for receiving Comments/Suggestions: 08.12.2021 before 5.00PM. |
Notice Draft Model Connection Agreement Objections Replies |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge for H1 of FY 2022-23. Last date for receiving Comments/Suggestions: 10.02.2022 before 5.00PM. Date of Public Hearing through Video conference is scheduled on 26.02.2022 from 11:00 AM onwards. |
Notice TSSPDCL OP No 61 of 2021 TSNPDCL OP No 62 of 2021 TSSPDCL 15 min block data H1 TSNPDCL 15 min block data H1 |
||||||
Commission invites comments/suggestions in the matter of final hearing in O.P. No 10 of 2016 for consent to Telangana Super Thermal Power Plant (TSTPP Phase I) (2x800 MW) established by M/s NTPC Ltd Last date for receiving comments/suggestions : 06.07.2021 before 5PM. Date of Public Hearing through Video Conference is Scheduled on 14.07.2021 from 11:30 AM onwards. Further Hearing (through Video Conference) is on 20.07.2021 at 11:30 AM onwards. |
Public Notice Principal PPA TSTPP Phase 1 (2X800 MW) Supplementary PPA TSTPP Phase 1 (2X800 MW) Interim Order issued by TSERC Responses filed by TS Discoms in O.P.No.10 of 2016 Additional responses made by TS Discoms Objections Replies |
||||||
Commission invites comments and suggestions in the matter of Annual Performance Review (True up) for Transmission Business and State Load Dispatch Centre (SLDC) activity of TSTRANSCO for FY 2019-20. Last date for receiving comments/suggestions : 11.06.2021 before 5PM. Last date for receiving comments/suggestions is extended to 21.06.2021 before 5PM. Date of Public Hearing through Video Conference is Rescheduled to 01.07.2021 from 11:30 AM onwards. |
Public Notice Filings : TSTRANSCO (O.P.No.13 of 2021) (I.A No 6 of 2021) TSSLDC (O.P.No.14 of 2021) (I.A No 5 of 2021) Objections Replies Practice Directions for Conduct of Hearing by Video Conference. |
||||||
Commission invites suggestions/ objections/ comments from all stakeholders and public at large in the matter of according consent of Power Sale Agreements (PSAs) entered between. 1. TSDISCOMs and NTPC for a quantum of 400 MW under Phase-II, Batch-II Tranche-I of National Solar Mission. 2. TSDISCOMs and SECI for a quantum of 400 MW under ISTS MNRE Scheme Tranche VI. Last date to receive suggestions/objections/comments is on or before 16.07.2021 by 5.00 P.M. |
Notice 1.NTPC - TS Discoms proposal along with related documents 2.SECI- TS Discoms proposal along with related documents Objections Replies |
||||||
Commission invites comments and suggestions in the matter of True up filings of TSGenco for the Control Period FY 2014-19 and Tariff filings of TSGenco for the Control Period FY 2019-24. Last date for receiving comments/suggestions is Extended upto 12.03.2021 before 5PM Date of Public Hearing through Video Conference is rescheduled to 31.05.2021 from 11:30 AM onwards. |
Public Notice True up Filings of TSGenco in O.P.No. 5 of 2021 Volume 1 Volume 2 Tariff Filings of TSGenco in O.P.No. 6 of 2021 Volume 1 Volume 2 I.A.No 1 of 2021 Additional Information 1 Additional Information 2 Objections Replies Additional Data set Practice Directions for Conduct of Hearing by Video Conference. |
||||||
Commission invites comments and suggestions on the filings made by TSSPDCL and TSNPDCL in the matter of determination of Additional Surcharge for H1 and H2 of FY 2021-22. Last date for receiving Comments/Suggestions: 23.11.2021 before 5.00PM. Date of Public Hearing through Video Conference is scheduled on 22.12.2021 from 11:00 AM onwards. |
Notice OP No.48 of 2021 & IA No.21 of 2021 for H1 TSSPDCL OP No.49 of 2021 & IA No.22 of 2021 for H2 TSSPDCL OP No.50 of 2021 & IA No.23 of 2021 for H1 TSNPDCL OP No.51 of 2021 & IA No.24 of 2021 for H2 TSNPDCL 15 min block data_H1 15 min block data_H2 Additional Information Objections |
||||||
Commission invites Comments/Suggestions/Objections in the matter of Proposals of TSNPDCL for consent of Power Purchase Agreement entered with M/s.AAAL Power Private Limited for pruchase of power from 2MW Mini Hydel plant on Kakatiya Canal situated at Velichala (V) Chintakunta (M), Karimnagar district for extension of agreement period for 5 years i.e., from 02.10.2021 to 01.10.2026. Last date for receiving Comments/Suggestions: 11.11.2021 before 5.00PM. |
Notice TSNPDCL proposals along with related documents APERC order dated 23.08.2014 |
||||||
Commission invites Comments/ Suggestions/ Objections in the matter of Determination of fixed cost tariff of 7.5 MW Industrial waste based plant of M/s.MSR Mega Bio Power Private Limited. Last date for receiving comments/suggestions: 25.10.2021 before 5.00PM. Date of Public Hearing through Video conference : 08.11.2021. |
Notice Petition Add info 1 Add info 2 Objection Replies |
||||||
Commission invites Comments/ Suggestions/ Objections in the matter of TSNPDCL Proposals for consent of extending Power Purchase & Wheeling Agreement entered with M/s.Gayatri Sugars Limited for procurement of power from 6MW Bagasse Cogeneration plant at Adloor Yellareddy Kamareddy District for 5 years period i.e., from 23.05.2021 to 22.05.2026. Last date for receiving comments/suggestions: 13.10.2021 before 5.00PM. |
Notice TSNPDCL proposals along with draft PP&WA PP&WA and it's Amendments |
||||||
Commission invites comments/suggestions in the matter of TSDiscoms Proposals for relinquishment of TS Share from the 1) BPSA entered between TSDISCOMs with NTPC Limited for NTPC Ramagundam Super Thermal Power Station (Stage I&II). for 358.37 MW Capacity.
2) PSA entered between TSDISCOMs with Neyveli Lignite Corporation Ltd for NLC TPS-II (Stage I(59.05MW) and Stage II (105.95MW) Total capacity 165MW. Last date for receiving comments/suggestions: 18.10.2021 before 5.00PM. |
Notice Proposals along with BPSA & PSA & Additional Information MoP Guidelines Dtd 22-03-2021 & MoP Clarification Dtd 05-07-2021 |
||||||
Press Release Date: 01.07.2021 regarding Appointment of Advocate on Record in Supreme Court and Regular Counsel of TSERC before Hon’ble Supreme Court and ATE. | View | ||||||
Commission invites comments and suggestions in the matter of suo-moto approval of PPAs between tsdiscoms and tsgenco o.p.nos. 15 to 19 of 2021. Last date for receiving Comments/Suggestions on or before 18.06.2021 by 5PM. Last date for receiving Comments/Suggestions is extended to 24.06.2021 by 5PM. Date of Public Hearing through Video Conference is Rescheduled to 30.06.2021 from 11.30AM onwards. |
View Revised Public Notice Objections Replies |
||||||
Venues of Public Hearings on ARR & Tariff proposals for Retail Supply Business for FY 2022-23. | View | ||||||
TSERC visit to Smart grid for pilot project. | View | ||||||
Commission invites Comments/ Suggestions in the matter of Suo-Moto determination of compliance of Renewable Power Purchase Obligation of Obligated Entities for FY 2018-19 in O.P. No. 31 of 2020 (suo-moto) on or before 24.12.2020; 5.00 p.m. Virtual public hearing is scheduled on 28.12.2020. |
Public Notice TSSLDC report for FY 2018-19 Practice Directions for Conduct of Hearing by Video Conference Objection Received |
||||||
O.P. No. 24 of 2020 Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme is scheduled on 18.12.2020. |
Press Release Practice Directions for Conduct of Hearing by Video Conference |
||||||
Comments/suggestions are invited in the matter of petition filed by M/s.Gayatri Power Private Limited for determination of Tariff for its 2.2 MW hydel power plant (under O.P.No.57 of 2018) on or before 5:00 PM on 26.11.2020. Public Hearing in OP No. 57 of 2018 will be held through video conference on |
Revised Public Notice Public Notice OP.No. 57 of 2018 Add Info1 Add Info2 Objection Received Replies |
||||||
Commission Scheduled hearing on 23.07.2020 at 11:00 AM on petitions by M/s. Singareni Collieries Company Limited (SCCL). | Public Notice | ||||||
Commission invites comments and suggestions in the matter of determination of variable cost for existing biomass, bagasse and industrial waste based power projects in the state of telangana, and having power purchase agreements with the distribution licensees, for the period from 01.04.2019 to 31.03.2020., on or before 24.03.2020 by 5.00 P.M. | Public Notice | ||||||
Commission invites comments and suggestions in the matter of determination of generic tariff for electricity generated from refuse derived fuel based power projects in the state of telangana achieving commercial operation date during the period from 01.04.2020 to 31.03.2024 on or before 15.04.2020 by 5.00 P.M. | Public Notice | ||||||
Commission initiate proceeding in the matter of according approval for further amending the distribution and retail supply licence granted earlier to M/s. Southern Power Distribution Company of Telangana Limited (TSSPDCL) and also to permit taking over of assets falling under the additional area of operation from M/s. Northern Power Distribution Company of Telangana Limited (TSNPDCL). By 19.03.2020 on or before 5 PM. | Public Notice O.P.No.11 of 2020 |
||||||
Commission initiate proceeding in the matter of according approval for further amending the distribution and retail supply licence granted earlier to M/s. Northern Power Distribution Company of Telangana Limited (TSNPDCL) and also to permit taking over of assets falling under the additional area of operation from M/s. Southern Power Distribution Company of Telangana Limited (TSSPDCL) by 19.03.2020 on or before 5 PM. | Public Notice O.P.No.12 of 2020 |
||||||
In the matter of application of M/s. Singareni Collieries Company Limited (SCCL) seeking approval of - a) aggregate revenue requirement and tariff for the period from 01.04.2019 to 31.03.2024; (O.P.No. 5 of 2019) b) truing up of tariff for the period FY 2016-2019; (O.P.No. 4 of 2019) c) business plan for the period from 01.04.2019 to 31.03.2024; (O.P.No. 8 of 2020) d) capital investment plan for the period FY 2019-2024; (O.P.No. 9 of 2020) for 2 X 600 MW of its Singareni Thermal Power Plant (STTP) for the control period comprising five years from 01.04.2019 to 31.03.2024 in accordance with sections 62 and 86 (1) (a) of Electricity Act, 2003 read with Telangana State Electricity Regulatory Commission (Terms and Conditions of Generation Tariff) Regulation, 2019 (1 of 2019). | Public Notice Press Release O.P.No. 4 of 2019 O.P.No.5 of 2019 O.P.No. 8 of 2020 O.P.No 9 of 2020 Additional Submission Additional Info Replies to Objections |
||||||
Commission invites Comments, Objections and Suggestions in the matter of determination of cross subsidy surcharge for FY 2016-17 in terms of the directions of the Hon’ble High Court in W.A.Nos. 3 & 4 of 2019 on or before 5:00PM on 17.01.2020. | Public Notice Cross Subsidy Surcharge TSSPDCL TSNPDCL |
||||||
Commission invites Comments, Objections and Suggestions in the matter of approval of procedure as well as relevant forms to be adopted in consultation with the Commission by State Load Despatch Centre under the regulation being Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters for Solar and Wind Generation Sources) Regulations, 2018 (Regulation No. 3 of 2018) on or before 5:00PM on 04.01.2020. | Public Notice view |
||||||
Commission invites Comments/Suggestions on draft on (Deviation, Settlement Mechanism and Related Matters) for the State of Telangana on or before 25.01.2019 before 5 PM. | Draft Regulation Press release |
||||||
Commission Initiates proceedings in the matter of determination of special category and tariff for Electric Vehicle Charging Stations / Battery Swap in telangana state. | Public Notice Press release TSSPDCL TSNPDCL |
||||||
Commission invites Comments/Suggestions & Objections in the matter of determination of generic tariff for wind power plants in telangana state on or before 07.08.2018 before 5 PM. | Discussion Paper Public Notice |
||||||
Commission invites Comments/Suggestions & Objections in the matter of determination of Tariff for Bagasse based cogeneration power projects in Telangana State on or before 28.07.2018 before 5 PM. | Discussion Paper Public Notice |
||||||
In the matter of seeking comments, suggestions and objections for the proposed fuel price escalation rate for Renewable Energy (RE) sources. | View | ||||||
Public Hearing In the matter of framing a regulation by the Commission on renewable power purchase obligation namely TSERC (Compliance by purchase of renewable energy / renewable energy certificates) Regulations, 2018 is scheduled on28.03.2018. at 11:30Am in Court hall of TSERC. | View | ||||||
Public Hearing in the matter of Grid Code for the State of Telangana is scheduled on 22.01.2018 at 11:30AM in the Court Hall of TSERC.. | View | ||||||
In the matter of approval for draft banking agreement to be entered by the TSDISCOMs for providing banking of energy generated by renewable energy sources, who are having captive consumption. | View View |
||||||
In the matter of determination of cross subsidy surcharge to be levied by the TSSDISCOMs for the financial years from 2005-06 to 2014-15 in respect of the open access consumers under section 42 of the Electricity Act, 2003. | View | ||||||
Commission invites Comments, Objections and Suggestions in the matter of approval of procedure as well as relevant forms to be adopted in consultation with the Commission by State Load Despatch Centre under the regulation being Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters for Solar and Wind Generation Sources) Regulations, 2018 (Regulation No. 3 of 2018) on or before 5:00PM on 04.01.2020. | Public Notice View |
||||||
Commission initiates proceedings to determine the cross subsidy surcharge for the years 2005-06 to 2014-15. | View Objection & Replies |
||||||
Commission issues notice on the petitions filed by TSDISCOMs for determination of additional surcharge FY 2017-18. |
|
||||||
In the matter of determination of additional surcharge to be levied for the FY 2017-18 in respect of the open access consumers by TSNPDCL under section 42 of the Electricity Act, 2003. | View | ||||||
In the matter of issuance of license afresh or the transmission activity in the state of Telangana to M/s. Transmission Corporation of Telangana in place of license issued by the erstwhile APERC in No. 1 of 2014 dated 11.07.2014 consequent formation of the state Telangana under sec 3 pf Andhra Pradesh Reorganisation Act, 2014 (Central Act, 6 of 2014). | View TSTRANSCO |
||||||
Public Notice for seeking comments, suggestions and objections for the proposed fuel price escalation rate for Renewable Energy (RE) sources. The last date is before 17:00 Hours of 06.05.2017. | View | ||||||
Public Hearing in the matter of Determination of Tariff in respect of (2X600 MW) Singareni Thermal Power project is scheduled on 26.04.2017 at 11.30 AM in the Court Hall of TSERC. | View Additional Information |
||||||
Application for amendment of the license for Distribution and Retail Supply | TSSPDCL TSNPDCL |
||||||
Commission invites suggestions/comments on Amendment to General Terms & Conditions (GTCS) on or before 30.09.2016 | Press Release Draft Amendment |
||||||
Comments & Suggestions are invited on the petition for tariff of Garrison Engineer Military Engineer Services , Air Force Station Hakimpet (MES) (Deemed Licencee) on or before 31.08.2016 by 5.00PM | Public Notice (English) Public Notice (Telugu) OP.No.15 of 2016 |
||||||
Public Hearing in the matter of according In-principle approval to the Power Purchase Agreement (PPA) entered into between NTPC Limited (NTPC) and The Telangana State Southern Power Distribution Company Limited (TSSPDCL) for sale of power from the Telangana Super Thermal Power Project Ph-I (2x800 MW) situated at Ramagundam, in Karimnagar District, Telangana is rescheduled to 20.06.2016 at 11:30AM (instead of 18.06.2016) in the Court Hall of TSERC | Replies to Objections Received Objections Received Amendment to Press Release Press Release Amendment to Public Notice Public Notice PPA related documents |
||||||
Public Hearing in the matter of according approval to the Power Purchase Agreements (PPAs) entered into between Telangana State Power Distribution Companies (TSDISCOMs) and individual generating companies (developers/investors) in the 60 MW solar park at Zaheerabad in Telangana State developed by M/s. Enrich Energy Private Limited and 2 MW in 10 MW solar park developed by M/s. Rays Power Infra Private Limited is scheduled on 17.06.2016 at 11:30 AM in the Court Hall of TSERC |
Replies of Discom to Objections Press Release |
||||||
Extension of time for receipt of Comments & Suggestions invited In the matter of Determination of Tariff for (2x600 MW) Singareni Thermal Power Project situated at Pegadapalli (Village) , Jaipur Mandal in Adilabad District , Telangana : from 30.04.2016 by 5.00PM to 21.05.2016 by 5.00PM | Amendment to Public Notice Public Notice PPA Filings |
||||||
Comments & Suggestions are invited In the matter of according approval to the Power Purchase Agreements (PPAs) entered into between Telangana State Power Distribution Companies (TSDISCOMs) and individual generating companies (developers/investors) in the 60 MW solar park at Zaheerabad in Telangana State developed by M/s. Enrich Energy Private Limited and 2 MW in 10 MW solar park developed by M/s. Rays Power Infra Private Limited on or before 20.05.2016 by 5.00PM | Public Notice | ||||||
Extension of time for receipt of Comments & Suggestions are invited In the matter of according consent to the Power Purchase Agreement (PPA) entered into between M/s. Telangana State Southern Power Distribution Company Limited (TSSPDCL) and M/s. Telangana State Northern Power Distribution Company Limited (TSNPDCL) and M/s. Singareni Collieries Company Limited (SCCL) for procurement of power from 2 x 600 MW Singareni Thermal Power Project situated at Pegadapalli Village, Jaipur Mandal in Adilabad District, Telangana : from 30.04.2016 by 5.00PM to 21.05.2016 by 5.00PM | Amendment to Public Notice Public Notice PPA |
||||||
Public Hearing Schedule on ARR & Tariff Proposals for Retail Supply Business including Cross Subsidy Surcharge & Addl. Surcharge for Open Access Consumers for the FY 2016-17 | View | ||||||
Comments & Suggestions are invited In the matter of Determination of Tariff for (2x600 MW) Singareni Thermal Power Project situated at Pegadapalli (Village) , Jaipur Mandal in Adilabad District , Telangana on or before 30.04.2016 by 5.00PM | Public Notice Filings |
||||||
Public Hearing in the matter of determination of Generic Tariff for generation of energy from Municipal Solid Waste (MSW) in the State of Telangana is scheduled on 11.03.2016 at 11.00 AM in the Commission’s court hall | Public Notice Consultant's Analysis on Objections/Suggestions |
||||||
Public Hearing is scheduled on 11.02.2016 at 11.00 AM in the Commission’s court hall in the matter of Power Purchase Agreement for purchase of 1,000 mw of power on long term basis between Chhattisgarh State Power Distribution Company Ltd - CSPDCL and TSSPDCL & TSNPDCL (O P No. 93 of 2015) | Public Notice PPA Objections received Letter to Discom |
||||||
Comments & Suggestions are invited In the matter of determination of tariff from Municipal Solid Waste (MSW) to energy by 12.02.2016, 5:00 PM | Public Notice | ||||||
Comments & Suggestions are invited on Draft Amendment Regulation - Telangana State Electricity Regulatory Commission (Amendment to Regulation adopting previously subsisting regulations, decisions, directions or orders, licences and practice directions) Regulation, 2013 | Draft Regulation Press Release |
||||||
Comments & Suggestions are invited on Draft Regulation - Telangana State Electricity Regulatory Commission (Compliance Audit) Regulation | Draft Regulation Press Release |
||||||
Comments & Suggestions are invited on Draft Regulation - Constitution of State Advisory Committee and its Functioning Regulation, 2015 by 20-10-2015, 5:00 PM | Draft Regulation Press Release |
||||||
Comments & Suggestions are invited on Power Purchase Agreement for purchase of 1,000 mw of power on long term basis between Chhattisgarh State Power Distribution Company Ltd - CSPDCL and TSSPDCL & TSNPDCL (O P No. 93 of 2015) by 20-10-2015, 5:00 PM | Public Notice PPA |
Jurisdiction issue which was heard in part on 24.07.2015 will be continued on 01.08.2015 at 3:30 PM | |||||
Comments & Suggestions are invited on waiver of cross subsidy surcharge for the open access consumers of the state buying solar power from state solar power developers” by 27-07-2015, 5:00 PM | Public Notice | ||||||
Public hearing on Daft TSERC - Telangana State Electricity Regulatory Commission (Establishment of Forum for consumer grievances and Vidyut Ombudsman for Redressal of Grievances of the Consumers) Regulations, 2015 is scheduled on 25.07.2015 at 11:00 AM at Commission's Court Hall | Draft Regulation Press Release |
||||||
Commission invites suggestions on draft regulation - Telangana State Electricity Regulatory Commission (Establishment of Forum for consumer grievances and Vidyut Ombudsman for Redressal of Grievances of the Consumers) Regulations, 2015 by 13th June, 2015 | Draft Regulation Public Notice |
||||||
Commission invites comments, suggestions and objections for the proposed fuel price escalation rate for Renewable Energy (RE) sources on or before 10.06.2015,17:00Hrs. | View | ||||||
Notice:Inviting Suggestions,Comments and Objections on draft Model Solar PPA | Public Notice PPA Addendum |
||||||
Public notice issued by Discoms on ARR & Tariff Proposals for Distribution Business for Third Control Period (FY 2014-15 to FY 2018-19) | Telugu English |
||||||
Public notice issued by Discoms on ARR &Tariff proposals for Retail Supply Business for FY 2015-16 | Telugu Urdu English |
||||||
Replies on Objections received in respect of ARR & Tariff proposals for Retail Supply Business for FY 2015-16 | TSSPDCL TSNPDCL |
||||||
Objections received in respect of ARR & Tariff proposals for Retail Supply Business for FY 2015-16 received as on 09-03-2015 | View | ||||||
Public notice issued by Discoms on ARR & Tariff Proposals for Distribution Business for Third Control Period (FY 2014-15 to FY 2018-19) | Telugu English |
||||||
Venues of Public Hearings on ARR & Tariff proposals for Retail Supply Business for FY 2015-16 | View | ||||||
Public Hearings on ARR & Tariff proposals for Retail Supply Business for FY 2015-16 | View | ||||||
Public notice issued by Discoms on ARR &Tariff proposals for Retail Supply Business for FY 2015-16 | Telugu Urdu English |
||||||
Commission invites suggestions and data relating to implementation of Regulation No 2 of 2005. Hearing is scheduled on 20.06.2015 at 11:00AM in Court Hall of TSERC. | View |